New Two Storey Residence (Front Unit 44A): Yokine

This is the Front Unit of a 2 Lot Battle-Axe Sub-Division in Yokine and part of the Latrobe four-Unit Development. With both West Australian Planning Commission (WAPC) Approval and Development Application (D.A.) Approval from Local Council satisfied, fully Engineered and Certified Architectural Plans have been completed and a Building Permit issued.

Construction has commenced and for this alternative construction and energy efficient Build, the Client and Design2Solution have collaborated with experienced Structural Insulated Panel (SIPs) Builder, Bellissimo Homes.

Through a combination of design, (to ensure most appropriate Site orientation for Winter Solar Gain and Summer Shading) and, the energy efficiency of Bellissimo Homes EcoSIPs with Canon uPVC double glazing and roof insulation to suit, this Two Storey Home has achieved a 7.4 Star Rating. In terms of performance, this allows the home to start from a better baseline as the EcoSIPs construction method provides increased building sealing. When mechanical heating and cooling are introduced, running costs will be less accordingly due to lower demand. Future install of solar panels on the North-facing Skillion Roof will further reduce outgoings.

Under Construction Photo’s as the Project unfolds..

Rendered Image
Colour Palette
Windows to Ground Flooor

Porch
Elevated View Overall progress
UF over Garage Roof Framing

Garage & Store
View from Crossover
Upper Floor ready for Render

Study at Stair Void
Ensuite Lining
Bulkhead to Dining Rm

Dining Rm Sliding Door
Ceiling Frame to Living
Ground Floor Trusses

Parapet Wall at Alfresco
Ground Floor Roof Framing
Entry Porch & Garage

Pantry Wall
Pre-wire Electrical to Truss Roof
UF Electrical Pre-wire
Skilion Roof Fascia & Eave Detail
Eaves Framing to Upper Floor

Upper Floor over Colorbond Fence
Upper Floor over Fence
Elevated View Upper Floor SIPs
Upper Floor Roof Framing on
SIPs Walls Installed
SIPs Ground & UF Walls

Upper Floor Panels
Upper Floor Panels installed
view into Posistruts
Posistrut Upper Floor
SIPs and Face Brick Garage
Ground & UF Elev in Progress

Upper Floor Panels Ready
SIPs loaded to Upper Floor
Lightweight Timber Floor
Posistruts to Beam
Upper Floor Framing
Posistrut Floor Delivered

Dining Room Opening Steel
SIPs Ground Floor near complete
Garage Brickwork complete

Driveway 44A & B
Site progression
Overall progress
Driveway Base
Alfresco to Living

Kitchen L’dry external
Panel Columns
Back wall Kitchen
SIPs
Panel progress

Kitchen Panels
Third Bond external brickwork
2c Augusta Face Brick
Parapet Wall

2c internal brick
Third Bond Brickwork
PermaCav Insulation
Cavity Insulation
Parapet Wall Bathrm & Bedroom

Builder installing SIPs
Installing Panels
Panel Install commenced
L’dry Panels to B’work

Structural Insulated Panels
2.7m Panels
Augusta Brick
SIPs & B’work at Entry
Garage Front

Rear of Garage
Attached Piers
Augusta 2c Limestone

Brickwork underway
SIPs for Install
SIPs stacked

SIPs stacked on-site
SIPs delivered
Bricks delivered

Steel Up
Corner Column Base
Column Setout

Tube-Out
Services to UF Duct
Slab Screeding

Screeding the Slab
Boom pouring Concrete
Boom overhead

Conc pour & Mesh
Feeding the Concrete Pump2
Feeding the concrete pump

Sand Pad Compacted
Comb Meterbox
Driveway Entry

Filed Under: Uncategorized

ⓒ Copyright 2021 DESIGN2SOLUTION