This is the Rear Unit of a 2 Lot Battle-Axe Sub-Division in Yokine and part of the Latrobe four-Unit Development. With both West Australian Planning Commission (WAPC) Approval and Development Application (D.A.) Approval from Local Council satisfied, fully Engineered and Certified Architectural Plans have been completed and a Building Permit issued.
Construction has commenced and for this alternative construction and energy efficient Build, the Client and Design2Solution have collaborated with experienced Structural Insulated Panel (SIPs) Builder, Bellissimo Homes.
Through a combination of design, (to ensure most appropriate Site orientation for Winter Solar Gain and Summer Shading) and, the energy efficiency of Bellissimo Homes EcoSIPs with Canon uPVC double glazing and roof insulation to suit, this Two Storey Home has achieved a 7.4 Star Rating. In terms of performance, this allows the home to start from a better baseline as the EcoSIPs construction method provides increased building sealing. When mechanical heating and cooling are introduced, running costs will be less accordingly due to lower demand. Future install of solar panels on the North-facing Skillion Roof will further reduce outgoings.
Under Construction Photo’s as the Project unfolds..
- Rendered 3D Images
- Colour Palette
- Upper Floor Render
- Upper Floor to garage
- Upper Floor ready for Render
- Upper Floor Eaves
- Upper Floor Skillion Lining
- Prep for Render
- Scaffold lowered
- Upper Floor Skillion Roof
- Garage / Store Brickwork
- Upper Floor Roof complete
- Pre-wire Electrical to UF
- AC Ducting install
- Upper Floor & Garage
- Ground & UF Walls in place
- Corner UF Skillion Roof
- UF Panels & Roof Framing
- Checking Loaded SIPs UF
- SIPs loading to Upper Floor
- Crane Driver
- Crane On-site
- Upper Floor Frame Installed
- South Wall Panels to Kitchen
- North East Corner
- First Panels up
- Panels ready for Install
- Panel Detail
- Stacked Panels
- Panels delivered
- Garage Brickwork complete
- Combination Meterbox & Driveway
- Garage from Driveway
- Augusta 2c Brick
- Garage Brickwork at Entry
- Garage from Front
- Brickwork well underway
- Driveway at Garage
- Bricks delivered
- Corner Column Base
- Slab with Columns
- Services at Duct
- Slab finishing
- Poured Slab
- Feeding the Concrete Pump
- Feeding the Concrete Pump 2
- Set-out
- Corner Set-out Point
- Sand Pad
- Compacted Sand Pad