Alteration / Addition Split Level: Coolbinia

Construction Underway..!

A Development Application (D.A.) to Council approved & fully Engineered Working Drawings complete, this collaboration SIPs Project with Bellssimo Homes, take’s the original 1950’s house and re-works the floor plan for greater footprint including: extending the existing main floor Living / Dining with direct access to a new Alfresco and vista to the garden, a new Master Suite to the lower ground floor for a large Dressing, spacious Ensuite and, Main Bedroom that looks out across the existing Pool. Other miscellaneous Works include a re-designed main Bathroom, new Fit-Out to the Laundry and Re-Roof to replace Tiles with Colorbond Customorb and, to provide covered parking a new Double Carport with Cascade Steps forming part of the new Landscaping & Retaining to the Front Elevation.

 

Under Construction
Roof Junction
Alfresco to Bedrm Roof
LVL Strutting Post
TP1 Alfresco Post

Roof in progress
Roof Carpenter
Alfresco Roof Framing
Rear Elev Roof Framing
LVL Ridge Up
Alfresco Ridge installed

Ridge Beam Fixing
Fixing LVL Ridge
Double LVL Ridge
Setting LVL Ridge Beam
Installing LVL Ridge
LVL Ridge Beam install

LVL Mitered Corner
Mitered LVL Corner
Pad Footing Alfresco
Alfresco Steel Posts
LVLs to Alfresco
Alfresco LVL install

Installing LVL
LVL to Alfresco
Ceiling Trimmers
Powder Rm Ceiling
Roof Timber Main Bedrm
Bedrm Wing Roof

Living Dining Roof
Living Dining Roof
Patch Bwork
Added Bwork Living Dining
Window Cutout
SIPS to Brickwork

Boundary Wall
Boundary Brickwork
Fixing Sill Panel
Sill Panel
Wall Base Flashing
Panel Flashing Detail

Bedrm Panels
future Pool vista
Bedrm Walls
Walls in progress
Bedrm Panels
Stacked Panels ready

SIPs stacked On site
SIPs Delivered
Ensuite Tubeout
Wet Area Setdown
Bottom Plates Fixed
Boundary Wall & Btm Plates

Drilling the Bottom Plate
Fixing Bottom Plate
Steel Column up
Structural Column
SIPs mark out
Panel Setout

Conc Slab Old & New
New & Old Slab
Wet Slab lower
Lower Slab Wet
Wet Top Slab
Top Slab Wet

Wet Area Slab
Return & Wet Area
Float the Concrete
Float the Slab
Concretor Team
Slab progress

Concrete being pumped
Concrete Pumping
Screeding
Slab Screed
Concretors
Slab pour

Formwork set up
Formwork ready
Installing Formwork
Formwork Prep
Exist. Pool to demo Patio

Lower Patio gone
Existing Patio gone
Brickwork & Slab retained

Existing Living / Dining
New Carport
Elevated Front View

Rear View
PFC Roof Beam
Roof Steel Living Dining

Lintel Installation
Installing Lintel Panel
UB Steel Beam
Hoiting Roof Steel
UB Steel Beam
Hoisting Roof Steel 2

Lintel to Column
Head Lintel Steel